HEALTHCARE
METROHEALTH GLICK CENTER TRANSFORMATION PROJECT
As part of MetroHealth’s major campus modernization initiative, our team supported the Glick Center by delivering general electrical installations and a complete fire alarm system build‑out. These upgrades strengthened the facility’s critical infrastructure, enhanced life‑safety performance, and contributed to the reliable operation of this state‑of‑the‑art healthcare environment.
LOUIS STOKES VA MEDICAL CENTER - EHRM UPGRADES
Our team delivered the $25 million EHRM Infrastructure Upgrades project, modernizing technology, electrical, mechanical, and architectural systems across 57 telecommunications rooms within an active medical center. The work included new CAT6A and fiber backbone infrastructure, centralized UPS systems, expanded TR spaces, selective abatement, and major mechanical upgrades such as AHUs, VRF systems, chillers, and hydronic piping. New building automation controls, full system testing, and commissioning ensured long‑term reliability. Executed through detailed CPM scheduling and tightly coordinated shutdowns, the project maintained uninterrupted operations while a dedicated on‑site team upheld rigorous safety, ICRA, and QA/QC standards throughout construction.
LOUIS STOKES VA MEDICAL CENTER - K-WING RENOVATION
Our team completed a multi‑phased, $12 million renovation of 23,000 SF within the active K‑Wing at the Louis Stokes Cleveland VAMC, upgrading research, clinical support, and dialysis spaces across two floors. The project included selective demolition, abatement, architectural improvements, a penthouse extension, and extensive MEP upgrades, including new AHUs, VRF systems, electrical and technology infrastructure, and coordinated mechanical piping and controls. Delivered through tightly sequenced phases, the work required detailed shutdown planning, multi‑shift scheduling, and close coordination with VA staff. A dedicated on‑site team implemented rigorous safety, ICRA, and QA/QC processes to maintain uninterrupted operations and ensure high‑quality performance throughout construction.
LOUIS STOKES VA MEDICAL CENTER - PACT REALIGNMENT
Our team delivered the $11 million PACT Realignment project, constructing a new 12,000 SF three‑story addition and completing phased interior renovations within the active Louis Stokes Cleveland VAMC. The work included selective demolition, ICRA‑compliant preparation, new structural foundations, masonry and glazing systems, and full interior architectural upgrades. Extensive MEP improvements—new AHUs, mechanical piping, ductwork, sprinklers, and updated temperature controls—were integrated with existing building systems, supported by certified testing and commissioning. Delivered in five coordinated phases, the project relied on detailed shutdown planning, multi‑shift scheduling, and close coordination with VA staff to maintain uninterrupted patient care and facility operations.
CLEVELAND CLINIC H BUILDING
Our team supported critical facility upgrades at the Cleveland Clinic H Building by delivering comprehensive fire alarm system enhancements and interior lighting installations. The work improved life‑safety performance, modernized illumination throughout clinical spaces, and contributed to the overall reliability of this essential healthcare facility.
METROHEALTH BEHAVIORAL HOSPITAL
Our team supported this specialized behavioral health facility by managing the procurement of a critical backup generator system. This work helped ensure reliable emergency power capabilities, strengthening the hospital’s ability to maintain essential operations and patient safety during power interruptions.
UNIVERSITY HOSPITALS AHUJA MEDICAL CENTER
Our team supported ongoing improvements at UH Ahuja Medical Center by providing general electrical services throughout the facility. The work enhanced operational reliability and contributed to the continued delivery of high‑quality care within this modern acute‑care hospital.
CLEVELAND CLINIC MENTOR HOSPITAL
Our team enhanced the exterior environment at Cleveland Clinic Mentor Hospital through a comprehensive site lighting installation. The upgraded illumination improves visibility, strengthens campus safety, and supports a more secure and welcoming experience for patients, staff, and visitors
CLEVELAND CLINIC NEUROLOGY BUILDING
Our team is supporting the construction of this state‑of‑the‑art neurology facility with comprehensive electrical infrastructure work. The scope includes a full 9th‑floor buildout featuring new switchgear, hospital‑grade power systems, communications pathways, tele/data rooms, and specialized electrical connections for advanced imaging equipment, including X‑ray and MRI. These installations will help enable reliable, high‑performance operations for one of the nation’s leading neurological care centers.
CLEVELAND CLINIC COLE EYE INSTITUTE
Our team supported critical infrastructure enhancements at the Cleveland Clinic Cole Eye Institute by completing underground electrical installations and providing emergency backup power connections. These upgrades strengthened the facility’s fire alarm system and life safety infrastructure, helping ensure reliable protection for patients, staff, and clinical operations.
NORTH LAS VEGAS VA MEDICAL CENTER
Our team supported the roof coating project at the North Las Vegas VA Medical Center by removing the outdated lightning protection system to allow roofing crews to complete a full coating over the existing rolled asphalt roof. We provided new UL‑listed 2026 drawings and coordinated closely with the roofing contractor to remove, replace, and fully recertify the 25‑year‑old lightning protection system. The upgraded installation was inspected and approved under current UL standards, ensuring enhanced safety and long‑term compliance for the facility.